The following detail drawings meet the requirements as set forth in the City of San Antonio’s Standard Specifications for Construction - June 2008. The Input/Output System Module 2 5 Components. For more information, contact Council's Building Control Unit on (07) 838 6677. AutoCADDetails. Construction Procedure Directive (CPD) memorandums also are issued to clarify information already contained in the manual, introduce a process change, remind readers of existing policy, announce a new form, or inform the reader of a change in address or contact. All pool dimensions (rough shell and finished), fixtures, recesses for inlets and drains must be coor-dinated. Install the sump pump, wiring, and the discharge pipe with the check valve. Step 1: Location. The wastewater can easily soak on the ground. Building codes provide local government with a way to guard the public's personal safety, much like traffic laws regulate driving. Our office is located at:. Cut eight six foot lengths of 2”X4” Assemble the 6 ft. We put new business prospect leads within your reach. The standard detail drawings below apply to all Site Permit Review (formerly Concurrent Review). 4 is equal to or greater than the required area for. AUS-SPEC generic specifications were used for construction and design of civil infrastructure in Townsville prior to 27 October 2014. Photo courtesy of Kevin Harvell, Water Quality Forester, N. 0157 Order/Dispatch: Phone: Administration Fax: Find Us Online: Fax 201. 16-3-101 et seq. General Cumulative Impacts During Construction, Operations and Maintenance Phase 163 B. Refer to ACI 223 for procedures for the design and construction of shrinkage-compensating concrete slabs-on-ground. Item Price: $1. The problem arises when the water stops ‘moving’ through the soil. 3 Other Types of Rotary Drilling Downhole Hammer One of the more popular methods for drilling geothermal wells is the air hammer method. W25B - Valve Manhole for 10" and 12" Gate Valves. sm‐std6 – 2” air relief details, 2" outlet details for air relief /pitometer sm‐std7 – drain assembly details outlet/ drain/ vault details sm‐std8 – valve box, stem & pitometer details sm‐std9 – flange and victaulic details; pccp and steel pipe welded joints. In accordance with BS6399-1, revised to date, the imposed loading will be taken as shown in Table 1 below. Why do we Need Soak Pit Tank ? The water in the septic tank is not pure, it is called grey water because it still contains organic materials that need to be filtered out. This article is about bbq pit plans. Created Date: 9/29/2014 10:55:21 AM. Loading The proposed building will be a single occupancy residential dwelling. This document is provided as guidance and provides recommended procedures for use by those responsible for ensuring compliance with the Construction General Permit. It can be a paved area like a terrace or courtyard of a building, or an unpaved area like a lawn or. 50-150mm river run stone to be used 1m around soakhole. Technical Details. Sewage is a collection of waste water from domestic purposes or commercial purposes or industrial purposes. This is determined by the geologic,physical,environmental,economic,and legal circumstances that pertain to the ore deposit being mined. Engineering Calculations 22 B. The soak pit, consisting basically of a simple pit (generally approximately 1 m 3), should be between 1. Please refer to the Sample Tree Pit Configuration Sheet on page 23 for a range of possible tree pit sizes. More Post Base Drawings and Construction Details. Hence the soil surrounding the soak pit is always going to be saturated with water. a) Construction of Light Structure Academic Building at Khajura, Banke b) Construction and Renovation of Central l. BMW selects KPIT as software development partner for Autonomous Driving. CONSTRUCTION SAFETY AND SECURITY COMPLIANCE MANUAL iii Changes to the Construction Safety and Security Manual 1 July 18, 2012 Pg 36, & ii Funds withheld from deposit for non-returned keys 2 July 19, 2012 Pg 30-32 Added terminal construction barricades and dust wall requirements 3 July 28, 2012 Pg 59-60 Revised “Badge Request Letter”. h-1029 criteria for design & construction of canopies 17. 0157 Order/Dispatch: Phone: Administration Fax: Find Us Online: Fax 201. Fittings are combination wye and bends. The rate of soakage into the ground has not been considered as the nature of the ground varies throughout the district and in areas of poor soakage. 3 Other Types of Rotary Drilling Downhole Hammer One of the more popular methods for drilling geothermal wells is the air hammer method. Sokhtas are water conservation structures that can be constructed in minimal space and require very less time, investment, and maintenance effort. Adequate guide mast brackets, bracket spacing and supports as required by the elevator manufacturer and all governing codes. costly design changes or delays that may. 41 6138 Rev. As such, procedures relevant to application for approval of plans, permit to carry out building works and supervision of building works shall apply. Builders' responsibilities Individual builders are responsible for management of stormwater on a building site during construction. Particles and biomass will clog the pit so need to be cleaned or moved. concrete, gas, oil, paint; and blacktop (4) No trenching within the critical root zone (5)Trees within the CRZ must be watered every 10. h-1021 chain link fence. This section of Construction details includes: 2D blocks of architectural details, different construction, concrete, steel, metal structures, composite building details, composite. Complaints about buildings under construction should be directed to the builder or building certifier whose contact details are shown on the. All discharge water shall discharge either outside of the building onto a splash block or into a sump pit that will handle full flow for at least 4 minutes. Find answers to frequently asked building and remodeling questions. 10% cement by volume, 6” depth ‐ 10% cement by weight, 6” depth). The list provided is for informational purposes and to assist with planning, scheduling,. Supporting proposal to be submitted and obtain consent before starting of excavation. A family of six intends to dig a pit latrine with an operational life of 20 years. Comparison of Wash Area and Soak Pit Construction: The Changing Nature of Urban, Rural, and Peri-Urban Linkages in Sikasso, Mali Ahrens, Brooke Mali 2002-2004 Michigan Technological University - Civil & Environmental Engineering Mali is a developing country with large water supply and sanitation needs and constraints. So that you can get a better idea of what the dock leveler pit construction looks like, we’ve put together some construction details and specification sheet for building your leveler pit. With Hycrete's solutions, regular concrete becomes hydrophobic concrete, keeping water out and reducing moisture vapor transfer. Survey Control Monuments. 2 in the following circumstances: a) The catchment area does not exceed 100 ha (but see Paragraph 1. The out let of the septic tank is directly connected to open drains. Farms which can achieve very high levels of dry removal ofsolidwaste,andlowlevelsofwateruse(ie. master-builders-solutions. doc WATER UTILITY STANDARD CONSTRUCTION DETAILS Detail # Description Drawing No. The outer two slabs have handles to help with their removal. Public Sewer Network is our number one priority. concrete, gas, oil, paint; and blacktop (4) No trenching within the critical root zone (5)Trees within the CRZ must be watered every 10. 1) is made by building an embankment or dam across a stream or watercourse where the stream valley is depressed enough to permit storing 5 feet or more of water. The Paper has been written with the aim of providing advice for all parties involved in the process of designing, building and maintaining swimming pools, and should be used in conjunction with:-. Design and Construction Standards for Centralized Pits The following design standards for centralized pits utilized by natural gas production operations to store wastewaters (e. Available formats for download in dwg, dxf and pdf format all in a single zip file. Engineering Design and Construction Manual – Standard Drawings – December 2015 (PDF) is available here. e-XtrAge Soak Pit. Centre of tree pit to be marked with timber stake (Minimum 1500mm). DESIGN AND CONSTRUCTION STANDARDS FOR SEPTIC TANKS, SOIL ABSORPTION SYSTEMS, AND OTHER SMALL WASTEWATER SYSTEMS Section 1. This article is about bbq pit plans. Loose dirt, clay and synthetic compositions are also legal. To obtain copies of these standards, please contact council. The cross-disciplinary environment in Revit however, often results in. chickenandsmall duckfarms), willnot normallyrequire septic tanks. Portland cement is made by heating a mixture of limestone and. Add to wish list. A structural engineering firm which drew up the plans for excavation works at a Mt Waverley construction site has been convicted and fined $380,000 after the pit collapsed, leaving homes teetering on the edge of a 10 metre drop. Joint Detail Lift Pit Minimum Cover 80mm 80mm Standard Lift Pit Construction BASFplc, Constuction Chemicals PO Box 4, Earl Road, Cheadle Hulme, Cheadle, Cheshire, SK8 6QG Tel. Fittings are combination wye and bends. When air flows across the top of the vent pipe, air is drawn up the pipe from the pit and fresh air is drawn into the pit from the building. Ed Gilman of the University of Florida, and Brian Kempf and Tyson Carroll of the Urban Tree Foundation, have developed a modern, up-to-date and peer reviewed set of details and specifications in AutoCAD and PDF formats for the green industry. distribution main - pe pipe standard details 1. (iii) Construction of necessary soak pits, drainage arrangement for soak pit etc. Revised: 2018 December 19. offers technical services free of charge. The tank which Stores a waste water of House or building is called Septic Tank. Sort all materials into piles by like items to ensure you have materials needed to complete project. Construction Sheeting Left in Place 1. com 19 Fountain 20 Roof Deck Over Habitable Space. 1 This Indian Standard ( Part 1 ) Second Revision was adopted by the Indian Standards Institution on 28 February 1985, after the draft finali- zed by the Water Supply and Sanitation Sectional ComGttee had been. BILLIARD TABLE-AUTOCAD-2D. For the one bag model (figure 7. Portland cement is made by heating a mixture of limestone and. How to build a soakaway To construct a basic stand alone soak away or one to use as a dispersal point for a French drain system where the water will gradually seep away into the surrounding soil. They are also referred to as dry wells, soak wells or soak pits in other countries, but in the UK are known as soakaways. Agriculture Handbook 590 Ponds—Planning, Design, Construction Figure 1 Typical embankment and reservoir An embankment pond (fig. Our technical information library provides the answer and expertise you need to get the "Wow!" your finished work deserves. 03 Building Sewer Location, Length and Spacing The location, maximum length, and spacing of laterals shall be as follows: 1. So that you can get a better idea of what the dock leveler pit construction looks like, we’ve put together some construction details and specification sheet for building your leveler pit. The walls resisting gravity and lateral loads are placed. Any building work which is subject to the requirements imposed by Schedule 1 to the Building Regulations shall be carried out in accordance with regulation 7. In areas without a public water supply, a water storage cistern should be constructed for each house or dwelling, along with a rainwater collection system from the roof or other suitable catchment. 00 shipping charge if we print the manual and ship to you directly. 1 Feasibility of on-site disposal of sewage On-site effluent disposal shall be considered feasible where the available area for evapotranspiration A A as defined in Table 2. Download and complete the Building Permit Application (PDF). DESIGN AND CONSTRUCTION STANDARDS FOR SEPTIC TANKS, SOIL ABSORPTION SYSTEMS, AND OTHER SMALL WASTEWATER SYSTEMS Section 1. Skimmer, Overflow & Infinity type. Reqæsts for permission and a cross connection manual may be directed to: PHILADELPHIA WATER DEPARTMENT. FOREWORD The Reinforced Concrete Design Manual [SP-17(11)] is intended to provide guidance and assistance to professionals engaged in the design of cast-in-place reinforced concrete structures. Parapet height for flat roof New two family dwelling one hour fire separation detail. This edition of The Layman’s Guide to Private Road Construction has been revised to include the most up to date information on mountain road construction and the impacts of poorly constructed mountain roads on stream water quality. The actual construction shall be done under the terms of these specifications and shall. 3 REHANDLING FROM A REHANDLING PIT6. 26 Curb Meter Pit with R. Comprehensive UK, Scotland and Ireland Construction Directory with daily updated construction news, plant hire and sale, job vacancies. Like steveray sez, contact your state elevator dudes. This site uses cookies. The soak pit, consisting basically of a simple pit (generally approximately 1 m 3), should be between 1. New York :Orange Judd Company,1894 [c1893]. Projects permitted by the State of Wisconsin shall utilize products listed on the PAL when appropriate. Advanced Bill of Material 24 2. 5 Gravel m3 0. Irving Blvd. 3 This capacity is not available with center opening doors. Good Building Design and Construction Handbook Page 3 Purpose of the Handbook This Handbook is made to provide simple information to house owners, to house designers and builders, and building monitors to teach principles of good design and good construction in natural hazard prone areas. UN-HABITAT-RAIN-2014-VIP LATRINE BOYS WITH URINAL Item Description Unit Quantity Unit price Kshs. Dig a hole or remove the concrete floor. The bottom commonly consists of a layer of puddled chalk or clay, over which is strewn a layer of rubble to prevent perforation by the hoofs of animals. 00 Craftsman Book Company 6058 Corte del Cedro, Carlsbad, CA 92011 Edited by Ben Moselle Turn your estimate into a bid. Standard Specifications for Bridge Construction Section 1, Excavation March 2013 1 - 1 1. Any contractor with a valid Veriforce Field Verification Report (FVR) with the appropriate Backfilling qualifications is qualified to perform the backfill. concrete cover to steel reinforcement to be 40mm 5. AUS-SPEC generic specifications were used for construction and design of civil infrastructure in Townsville prior to 27 October 2014. These bulkheads are often used as screed rails during placement and finishing of the slab. standard construction detail air release valve pit 9/10 file name: w7. All Details - PDF Complete Set as of 1/7/2019 (6. HVHZ Commercial Re-roof Statement. Shop Drawings: Submit Shop Drawings, indicating method, staging, and necessary details for construction of underpinning and support for each structure on which work is to be performed. INTRODUCTION 1. The town planning department of the municipal corporation shall ensure that the septic tank designs conform to the guidelines at the time of approval of building plan. Now I want to construct a septic tank and soak pit which can stand both summer and rainy season. Where a soak pit is required, a building consent application with calculations for soak pit sizing must be approved by the building consent authority. 3 MB Tree pits construction guide Tree pits construction guide PDF 515. These CAD drawings include more than 100 high-quality DWG files for free download. Detailed design guidance is given in BRE Digest 365 or CIRIA Report C753. Aldo DiTonto, the engineer and sole director of the firm, was also convicted and fined $100,000. SD 274 Precast Concrete Pit Cover with Circular Cast Iron Insert 600 x 600 Pits. Location The location of the building sewer shall be as follows:. dwg detail ref: w-7. Click to enlarge. Each pit has a vent pipe. Ways for deriving PIT LGDs and EADs using the same general framework that has been previously used for PIT PDs is described in detail in the following sections. 1 Introduction Most water wells in Ireland are drilled using an air-hammer (‘down-the-hole’ or DTH) rotary rig. 8 kb) cs-3118 side entry pit extension class d frame and lid - reinforcement details pdf (123. Soak pit by Jpnce college ravi kumar. construction safety and be able to determine appropriate usage on projects. Mining is never properly done in isolation,nor is it an entity in itself. COVID-19 Update. Military Videos Recommended for you. The pits are covered with four slabs. Project Center Guide. Hence the soil surrounding the soak pit is always going to be saturated with water. Comparison of Wash Area and Soak Pit Construction: The Changing Nature of Urban, Rural, and Peri-Urban Linkages in Sikasso, Mali Ahrens, Brooke Mali 2002-2004 Michigan Technological University – Civil & Environmental Engineering Mali is a developing country with large water supply and sanitation needs and constraints. TITLE S900 1 Water Trench Pavement Reconstruction (dwg) (dxf) (pdf) S900 2. find here septic tank layout plan, soak pit, and sectional elevation design in autocad format. Drywell leach pit kits are best practice for new septic systems, additions and repairs on pipe-in-gravel leach fields. : the hills shire counciloct. Biogas Plant Construction Manual April 2011 United States Forces - Afghanistan Page 1 of 24 1. 2 and Section 1. AutoCADDetails. 2m-3m) sd/500/8 catchpit type 2 precast concrete construction (depth 3m - 5m) sd/500/9 catchpit type 3 brickwork construction (depth up to 1. One Bath Plumbing Samples from www. Vinidex 100 x 90mm PVC Stormwater Draincoil Adaptor. HVHZ Wood Shingle / Shake System. 1) Furnish pre-construction and post-construction assessment for building and structures located within distance of 100 feet from centerline of proposed tunnel, and jacking and receiving pits. Select material (s) to add them to your zip folder, then download or email the files for easy access. The details were created to help the construction industry achieve the performance standards required to demonstrate compliance with the energy efficiency requirements of Part L of the Building Regulations. Privy pit design involves selecting the privy location, calculating the pit size, and determining the labor, materials, and tools needed for construction. These regulations shall be known as the North Carolina Fuel Gas Code as adopted by the North Carolina Building Code Council on September 14, 2010, to. 2 in the following circumstances: a) The catchment area does not exceed 100 ha (but see Paragraph 1. The soak pit is a pit through which the effluent is allowed to filter or seep into the surrounding soil. See Section 10. (a) Depth Of. In order store, the Wastage or sewage for 10-30 Days Septic tank is constructed and the same is designed. Description Unit Qty. As is the nature of our business and industry, yours and other important projects were in the planning, construction, or completion phases when COVID-19 appeared and began to escalate nationwide. Military Videos Recommended for you. What is Soak Testing? SOAK TESTING is a type of non functional testing that measures a system’s perfomance under a huge volume of load for an extended period of time. Few of the most. UDAHD Construction Of Soak Pit At Already Installed Hand Pump Submersible Wthin Ward No 1 To 16 72 Nos , Due Date: 13-05-2020 ,Tender Value: 1807200 , Location: Bihar Tender Notice 24284840. h-1022 beam barrier for dead end streets 16. For reserve pit construction on sloping sites, the preferred method is to locate the pit on the drill pad next to the high wall. Council will inspect the vehicle crossing prior to the pouring of concrete and on completion of the works to determine compliance with the specification. The well is built in dry brickwork for allowing water from the well to seep in the soil, top 1. 2 5 0 m m a x 1 6 0 m in 3 0 m m m in 2. These details may need to be modified to meet individual design conditions. fire hydrant 9. In order to promote public education and public safety, equal justice for all, a better informed citizenry, the rule of law, world trade and world peace, this legal document is hereby made available on a noncommercial basis, as it is the right of all humans to know and speak the laws that govern them. Greenhouse construction : a complete manual on the building, heating, ventilating, and arrangement of greenhouses and the construction of hotbeds, frames and plant pits / By. Once you have finished adding compost materials to the pit, you can backfill it with the soil you removed. Building Width & Door Opening Minimums – Conveyorized This section can help you plan the door and bay widths of a new building and determine if the floor plan of an existing building can accept a conveyorized car wash. Reports\10-5329-Construction Method Statement. Design and construction standards and details. Construction costs are highly site specific, depending on topography, soils, subsurface conditions, the local labor rate, and other considerations. Soakaway construction is a low environmental impact solution to drainage because it is uses few materials. Find construction Tenders and Projects within the building, infrastructure, mining and industrial sectors. Illustrated 12 page Generic Construction Guide plus 11 page Cardstock Modeling Guide. Pipe bursting is a well-established method for trenchless replacement of pipe throughout the world. GUIDELINES FOR THE CONSTRUCTION OF EARTH-FILL DAMS (November 2008) 1 1. Comparison of Wash Area and Soak Pit Construction: The Changing Nature of Urban, Rural, and Peri-Urban Linkages in Sikasso, Mali Ahrens, Brooke Mali 2002-2004 Michigan Technological University – Civil & Environmental Engineering Mali is a developing country with large water supply and sanitation needs and constraints. Building Powertrain Software Architecture for next-generation vehicles. Rainwater + Groundwater, Toilet flushing & Cooling Tower Makeup (above ground tank), City Water Pressure < Building Pump Pressure: RUCBIH: Underground Tank - Groundwater Sump and Treatment Skid - Rainwater Treatment - Above Ground Plastic Tank - CCES Building Pump - Solenoid Connection to Building Pump Inlet: PDF: DWG. 5 m shall be kept between the bottom of the tank to the seasonal ground water table. 2 billion initiative to rapidly scale up. Identify future well sites, when appropriate. Precast stormwater pits provide installation contractors with a number of significant benefits*: • Custom-made – Manufactured to meet your design requirements of your stormwater network with exact heights and pipe penetrations. Engineering Design and Construction Manual (December 2019) A copy of the: Engineering Design and Construction Manual for Subdivision in Growth Areas – December 2019 (PDF) is available here. All BSI British Standards available online in electronic and print formats. PRECAUTIONS 1. 2 D eep B ored S oakaw ay 3 2. 001 Fire Hydrant Installation HMUA-WAT-001 002 Typical Service Connection HMUA-WAT-002 003 Typical Strapping For Buried Pipe HMUA-WAT-003 004 Concrete Thrust Blocks HMUA-WAT-004 005 Pipe Crossing HMUA. 35-11-101 through W. 0 Drainage System Materials and Construction34 3. Information such as dimensions, parts, placement, and materials for each project can all be found in construction drawings to assure the project is. FULL PIT INSTALLATION (PIT MOUNT) Notice: The above is a generic application depiction drawing with generic bills of materials. Biogas Plant Construction Manual April 2011 United States Forces - Afghanistan Page 1 of 24 1. sand backfill. Opportunities are researched throughout South Africa and Africa. One Bath Plumbing Samples from www. Below we have compiled a list of forms and informative handouts that will provide you with current and resourceful information. typical detail - house connection notes 1. 3 and restored to match adjacent. ZMA048HA construction of safety bund walls. DRAWING NO. A sump pit is a hole that is designed to collect water and other spilled fluids. If so, you can flush the pit by adding fresh water until the pump removes the stale water. MAY, 1998 SECOND EDITION: The 1984 manual is revised and retitled. for details of grate and frames see r0220-04 and 4. FREQUENTLY ASKED QUESTIONS DRAINAGE 1. Projects permitted by the State of Wisconsin shall utilize products listed on the PAL when appropriate. erosion mat. PIT LAYOUT DETAILS PROJECT INFORMATION Job Name Address General Contractor Serco Distributor Quantity Voltage Dock Leveler Model CONSTRUCTION APPROVAL Company Address By Date HYDRAULIC LEVELERS MECHANICAL LEVELERS 22" 5" Pit dimensions and curb angle lengths on back page. A few wells are sometimes drilled using a cable-tool (percussion) rig. Tree pits can sometimes be referred to as bio- retention systems as they provide treatment through fine filtration, extended detention and some biological uptake. More details at thegardenglove. Figure 511–3 (a) Ventilation Provided. The details were created to help the construction industry achieve the performance standards required to demonstrate compliance with the energy efficiency requirements of Part L of the Building Regulations. They are also referred to as dry wells, soak wells or soak pits in other countries, but in the UK are known as soakaways. conventional construction, the engineered solutions are pro-vided in a prescriptive format. A building or combination permit is required to construct any masonry fireplace or wood burning prefabricated fireplace. Although the minimum depth of material in a horseshoe pit is four inches, eight inches is recommended for professional tournament play. The street/road is not identified on the Georgetown County Major Thoroughfare Plan. We offer Rainwater Harvesting, Septic Tank and Soak Pit Construction in Jammu Kashmir, Readymade Precast Septic Tank Construction in Jammu Kashmir - India, Precast Septic Tank Installation, Readymade Septic Tank, Readymade Soak Pit, Precast Soak Pit, Rainwater Harvesting in Jammu, Kathua, Udhampur, Samba, Srinagar, Precast Sewer Tank, Sewage Treatment Plant in Jammu Kashmir. Appropriate details, construction sequence, and timing are critical when reentrant corners are unavoidable. Item Price: $1. Air or mist drilling provides good formation sampling and can give reasonable estimates of geothermal fluid production. The chronological list of events in developing this manual is summarized as follows: JAN, 1984 FIRST EDITION: Standard drawings are compiled into the first edition of the manual. SCARIFY EXISTING SOILAROUND PERIMETER OF PIT TO A MIN, DEPTH OF 1OOMM. Whatever the arrangement, the pit must be completely waterproof. General Cumulative Impacts During Construction, Operations and Maintenance Phase 163 B. Excavation of pit 4. Details of anchor blocks page 40 Discharge through box culverts : inlet control page 41 Discharge through pipe culverts : inlet control page 42 Kerb Inlet chart 1: cross fall 2% page 43 Kerb Inlet chart 2: cross fall 2,5% page 44 Kerb Inlet chart 3 & 4 : cross fall 4% and 6% page 45 Pipe bedding details page 46. Soak pits/trenches provide volume for storage below ground level for stormwater to infiltrate into the surrounding ground. HardiePanel with Steel Z Furring Strips Fixture Penetration Rainscreen Download DWG, PDF, SHX, CTB. 8 in - 30 in Body to Adapter Dimensions. To prevent unsightly patches of dirt where you’ve dug the pit, cover it with sod or seed it with grass. They cast the four walls of the septic tank from ground level to what ever height you want and begins to sink in to ground by excavating the sands inside. dwg detail ref: w-7. Figure F-4: Details of Construction of Water Cistern. As a Navy Officer in the Civil Engineer Corps my duties included the administration and management of over $100 Million in contracts for the construction of the D-5 Trident Missile Production Facilities. These details may need to be modified to meet individual design conditions. Reports\10-5329-Construction Method Statement. The "Montgomery County Specifications for Utility Construction Permit" applies to all utility construction, reconstruction, or maintenance activities performed within the County right of ways (ROW) or easements under jurisdiction of Montgomery County. Where a soak pit is required, a building consent application with calculations for soak pit sizing must be approved by the building consent authority. Deck Post Base Drawings and Construction Blueprint. Because of the nature and construction of these FireBalls and the actual material, there is no guarantee to the finished look. Maintenance. Max increase 610 mm allowed in overhead. 35-11-2004; and W. Sewer Design Guide (Revised May, 2015) City of San Diego Public Utilities Department 9192 Topaz Way • San Diego, CA 92123 Tel (858) 292-6300 Fax (858) 292-6310. 21-45 (PDF) Pole Base : 22-45 (PDF) Pole Base and Pole Load Chart : 23-45 (PDF) Luminaire Support Arm and Attachment : 24-45 (PDF) "J-Hooks" Construction, Pole Handhole and Wire Inlet : 25-45 (PDF) Circuit Cable Connection : 26-45 (PDF) Steel Half Clamp and Simplex Cover Clamps : 27-45 (PDF) Clamp Assembly Clevis Type : 28-45 (PDF) Pullbox. Farms which can achieve very high levels of dry removal ofsolidwaste,andlowlevelsofwateruse(ie. USDA is an equal opportunity provider and employer. 8, or a seepage pit designed in accordance with N. damper specifications steel dampers fireplace width steel dampers (inches) a b c d e 24 -26 28. The design of suspended floors should conform to requirements of ACI 318 and ACI 421. Good Building Design and Construction Handbook Page 3 Purpose of the Handbook This Handbook is made to provide simple information to house owners, to house designers and builders, and building monitors to teach principles of good design and good construction in natural hazard prone areas. erosion mat. Sort all materials into piles by like items to ensure you have materials needed to complete project. The placement of curb, fencing, railing, or other encroachments within a tree pit shall be regulated by the Department of Parks & Recreation. Refer to ACI 223 for procedures for the design and construction of shrinkage-compensating concrete slabs-on-ground. We offer Rainwater Harvesting, Septic Tank and Soak Pit Construction in Jammu Kashmir, Readymade Precast Septic Tank Construction in Jammu Kashmir - India, Precast Septic Tank Installation, Readymade Septic Tank, Readymade Soak Pit, Precast Soak Pit, Rainwater Harvesting in Jammu, Kathua, Udhampur, Samba, Srinagar, Precast Sewer Tank, Sewage Treatment Plant in Jammu Kashmir. All these. SF-03 Standard Surface Fixing Detail - Timber Frame Construction. by "Mena Report"; Business, international Dams Hydroelectric power plants. vbex12s 24 31 26 weight 20. Installation Indoors Installation - Outside Building Above Ground Installation - Parallel Consult Local Codes for Approval 909QT-S/LF909S 909QT-S/LF909QT-S Air Gap (Drawings not to scale) TABLE OnE - CAPACITy REQuIRED FOR SySTEM 50 gpm 100 gpm 150 gpm 200 gpm 250 gpm 350 gpm Two 3⁄4" Two 1" Two 1 1⁄4" Two 11⁄2" Two 1 ⁄2. 1 DRY METHOD6. High Performance DPC & Cavity Tray Preformed Cloak Details. borehole logs are contained within this document. r cement to be used for all concrete work 4. construction, reconstruction or maintenance of vehicle crossings is the property owner/s responsibility. Engineering 11 1. 3 REHANDLING FROM A REHANDLING PIT6. Loading The proposed building will be a single occupancy residential dwelling. Where this occurs infiltration will only take place through the pit walls, therefore the base area is ignored when designing soakpits. 3 MB) Chapter 2 Earthwork (pdf 3. Concrete Reinforcement Modeling and Construction Håvard Vasshaug, Dark Page 7 of 88 Why use Revit in the first place? It is possible to track down building information modeling software that does 3D reinforcement better than Revit. Since the soak pit is odourless and not visible, it should be accepted by even the most sensitive communities. the details which have been agreed by the Local Authority, the relevant Building Control Authority and the approval given by United. 3 Influence of G eological S trata. The Baltimore County Department of Permits, Approvals and Inspections (PAI) publishes downloadable forms and information to be used in the permit process. Soak pit: Soak pit is a pit through which effluent is allowed to seep into the surrounding soil. PASSENGER ELEVATORS MACHINE-ROOM-LESS SYSTEM Eco Changes is the Mitsubishi Electric Group’s environmental statement, and expresses the Group’s stance on environmental management. h-1031 typical pavement key 19. Cement stabilized subgrade is specified as a percentage of cement per unit volume or by unit weight and a depth of manipulation (i. Soil and WaterDesign guidelines and resources for construction stormwater management. Structural library collection for columns,beams,foundations,rebars reinforcement,stirrups and links. Guidance on meeting these requirements on materials and workmanship is contained in Approved Document 7. Illustrated 12 page Generic Construction Guide plus 11 page Cardstock Modeling Guide. “Disposal field” means a disposal bed, a group of one or more disposal trenches, a drip dispersal area designed in accordance with N. This page includes describes some important construction details for soakaway pits, soakaway trenches and soakaway crate systems. 1/CSA B44-13, AND all local codes and regulations. Using Line & circle command draw Septic tank with soak pit. b) handrailing with flat. Why not locate it near a patio where you can take advantage of the colors and fragrances for hours on end! Figure 1 A rain garden can be built in the front or back. While living in Sikasso amongst its 150,000 residents, I learned how cultural and non-technical constraints affected sanitation improvements. Each time we flush the toilet or wash so that down the sink's drain,we create sewage (also known in polite society as wastewater). Chamber manufactured from glass reinforced cement with nominal wall thickness of 12mm. Cut twenty pieces of 2”X4” in to 14. 1 Materials34 3. Free Online Library: Construction Of Septic Tank & Soak Pit For Site Office Cum Field Hostel At Drungdhuran Dam Site Of Pakal Dul Hydroelectric Project, Cvpppl, Kishtwar, J&k. High Velocity Hurricane Zone Roofing Permit Forms. Precast stormwater pits provide installation contractors with a number of significant benefits*: • Custom-made – Manufactured to meet your design requirements of your stormwater network with exact heights and pipe penetrations. to soak pit or natural drainage. Biogas Plant Construction Manual April 2011 United States Forces - Afghanistan Page 1 of 24 1. Photo courtesy of Kevin Harvell, Water Quality Forester, N. Ladder fixed in the pit (1) and always placed in the climbing position (2). Septic tank plan dwg file. hole size. Water must be removed and disposed of in order for construction to move forward. Paving Block and Cobbles Floor Construction DWG Cad Details. As this drainage system deals with the surface water in the area where it is occurring, you are avoiding the need for processing or adding to the overburdened council drainage and sewerage systems. When air flows across the top of the vent pipe, air is drawn up the pipe from the pit and fresh air is drawn into the pit from the building. Item Price: $1. 2m-3m) sd/500/8 catchpit type 2 precast concrete construction (depth 3m - 5m) sd/500/9 catchpit type 3 brickwork construction (depth up to 1. The actual construction shall be done under the terms of these specifications and shall. The land slope may range from gentle to steep. A soak pit, also known as a soakaway or leach pit, is a covered, porous-walled chamber that allows water to slowly soak into the ground. Power Confirmation Sheets: Include motor horsepower, code letter, starting. 0157 Order/Dispatch: Phone: Administration Fax: Find Us Online: Fax 201. Sediment runoff rates from construction sites are 10 to 20 times greater than those from agricultural lands, and 1,000 to 2,000 times. 5 m shall be kept between the bottom of the tank to the seasonal ground water table. Military Videos Recommended for you. damper specifications steel dampers fireplace width steel dampers (inches) a b c d e 24 -26 28. 10m and 1m depth below invert level of the inlet pipe. Download Standard Detail Open Popup. 6 of Clause E1 of the NZ Building Code to ensure that surface water is discharged without overflowing. The cross-disciplinary environment in Revit however, often results in. I used landscaping timbers and landscape timber stakes to build the frame. Pita Pit International was formed to bring the Pita Pit concept to the world and has grown steadily since the first international location opened in New Zealand in 2007. • Air-hammer Rotary Drilling: This uses compressed air both to drive the drill, with a rotating hammer. Published material. 5 m rock filled soak trench or metres of 1. 8m Pipejack – machine; remote operation from surface Pipejack – machine; operator controlled below ground Pipejack – hand dig. The following procedure is generally fo llowed in India. BRE Digest 365 is the most commonly used document. Not all of the components listed are included or provided by the factory. 0157 Order/Dispatch: Phone: Administration Fax: Find Us Online: Fax 201. Stormwater drainage design is an integral component in the design of parking lots. 1/CSA B44-13, AND all local codes and regulations. Details of soakwells including depth, diameter, location and construction detail. We offer Rainwater Harvesting, Septic Tank and Soak Pit Construction in Jammu Kashmir, Readymade Precast Septic Tank Construction in Jammu Kashmir - India, Precast Septic Tank Installation, Readymade Septic Tank, Readymade Soak Pit, Precast Soak Pit, Rainwater Harvesting in Jammu, Kathua, Udhampur, Samba, Srinagar, Precast Sewer Tank, Sewage Treatment Plant in Jammu Kashmir. The treated waste is a nutrient-rich, nitrogen-rich fertilizer. The following are standard details for construction of public infrastructure in the City of Cambridge. 2012 NC Fuel Gas Code The changes below are to the 2009 International Fuel Gas Code. Please contact the Information Desk at 617-349-4811 for additional information. NOAA's Precipitation Data Frequency Server - Atlas 14 Rainfall Data Pennsylvania Data Map. L:\10\5\3\2\9\10-5329 - 6 Hereford Square, London - Mezzanine Floor\10. WCC-38 Grated Side Entry Pit Jan-08 WCC-39 Junction Pit Aug-03 WCC-40 Grate Pit Aug-03 WCC-41. Indicate proposed source of domestic water. If the glue isn't water resistant, the layers may separate when. They are also referred to as dry wells, soak wells or soak pits in other countries, but in the UK are known as soakaways. Post Caps, Hurricane Ties and Stair Stringer Details. Owner/Operator Requirements. Plastream Slotted Pipe. Design & Construction of Dry Wells Katie Blansett, PhD, PE PHRC Webinar Series | Tuesday, January 17 @ 1pm Pennsylvania Housing Research Center 219 Sackett Building | University Park, PA 16802 P: 814‐865‐2341 [email protected] sd/500/5 road gully details sd/500/6 footway gully - cast insitu details sd/500/7 catchpit type 1 precast concrete construction (depth 1. ) Filling the pit three times in quick succession whilst monitoring the rate of seepage, to represent soil moisture conditions typical of the site when the soakaway becomes operative. * Clay is not suitable for soak pits or trenches since it is difficult for the water to move into. Turn your bid into a contract. find here septic tank layout plan, soak pit, and sectional elevation design in autocad format. Typical specifications for pit-run gravel are listed in Table 1 (page 3). 2011 Construction Guidelines. ZMA048HA construction of safety bund walls. Opens In A New Window. Notes about Fasteners for Building a Deck. • Borrow pits should not affect the stability of the road, or any other structure. Septic System Sizing Charts for Trench, Chamber, or Seepage Pit Disposal. Send an e-mail to Jacqueline Brudlos and detail how you plan to use the map. If the depth of soak pit is not sufficient such water logged area may prevail at the level where building foundation are situated. Construction sheeting and bracing, placed by the Contractor to protect adjacent and neighboring structures, may be left in place if desired by the. PRECAUTIONS 1. HardiePanel with Steel Z Furring Strips Door Window Jamb Rainscreen Download DWG, PDF, SHX, CTB. If you don't find what you are looking for here please give us a call at (415) 781-9700 and we'll try to supply it. SOIL PIPE : A soil pipe is any pipe which conveys the discharge of water closets, urinals, or fixtures having similar functions, with or without the discharge from other fixtures, to the building drain or building sewer. Carved from a boulder, this fire pit looks very earthy and runs on gas, instead of firebrand. Notes about Fasteners for Building a Deck. or soakaway pits. 3) Gas Shut Off Valve Ordinance and Requirements; Swimming Pool and Spa Safety Act Summary (PDF) Wood-burning Appliances Ordinance (2000-35). clear stone berm for erosion control. must be constructed above ground water level at highest estimated ground water level. Notes on Walks and Wheelchair Ramps for Designers and Construction Engineers (PDF 138. KDHE bulletin 4-2: Minimum Standards for Design and Construction of Onsite Wastewa-ter Systems fulfills that purpose. for details of grate and frames see r0220-04 and 4. 15m (50ft) from any building, and sufficiently distant from any other soak away, including roof water soak aways. tSt2410(Partl)-1985 2. The material used in the construction of septic tank range from stone or brick masonry to concrete for a bigger community septic tank. 5 m diameter 3. uk This document contains proprietary information that belongs to BASF plc. To extend the life of a soak pit, care should be taken to ensure that the effluent has been clarified and/. NOAA's Precipitation Data Frequency Server - Atlas 14 Rainfall Data Pennsylvania Data Map. The standard details will also provide the. AUS-SPEC generic specifications were used for construction and design of civil infrastructure in Townsville prior to 27 October 2014. Plastream Slotted Pipe. The pit must be the same width and length as the hoistway, and should have a minimum 4” thick concrete floor. • Leaf Basket is for use with the Rainwater Pit to provide a barrier against leaves and other debris entering the waterways. As a Navy Officer in the Civil Engineer Corps my duties included the administration and management of over $100 Million in contracts for the construction of the D-5 Trident Missile Production Facilities. 4555/87 Author: PP&D Subject: A brochure highlighting Section 23 of Winnipeg By-law 4555/87 The Winnipeg Building By-law, which deals with subsurface drainage. Deck Stairs Design Blueprint and Drawings. Guidelines for soak pit design, including sizing, are provided in Verification Method E1/VM1 to New Zealand Building Code clause E1 Surface water or can be obtained from your local council. Illustrated 12 page Generic Construction Guide plus 11 page Cardstock Modeling Guide. Step 1: Location. HVHZ Wood Shingle / Shake System. Individual pits are formed by first excavating a trench which is then fully lined and sub-divided by building brick or block work partition walls. Infiltrate Water soakage into the soil. This safely and gradually saturates back into the water table. Example of concrete washout area. Learn how a septic system works. L ack of venting at the ends (at least) of each leach field lateral line (finger) is the most common cause of leach field failure - no fresh air in the pipes. Pressure Reducing Valve Vault – Pipe Penetration Detail and Wall Anchor 9-24-2013. • Borrow pits should not affect the stability of the road, or any other structure. This document is not intended to mandate or prohibit any particular. Chapter 14 - Trenchless Construction Section 14A-1 - General Information 4 Revised: 2013 Edition Jacking Shield: A fabricated steel cylinder from within which the excavation is carried out either by hand or machine. Septic tank is the underground, onsite, small scale sewage treatment setup, which collects the sewage for the decomposition activity by bacterial action. mesh construction fence is acceptable) In the CRZ: (1) No alteration or disturbance to existing grade (2) No storage of construction materials, equipment, soil, or debris (3) No disposal of any liquids e. Item Price: $12. 1/CSA B44-13, AND all local codes and regulations. But only in the last few years has the vision of manufactured homes as a technology for supplying a wider range of affordable housing needs begun to be realized. 4 of the soak pit's excavated volume. 3" Plumbing vent 6" above roof and 10" ~ from corner 3" Sanitary Cross or Double sanilarytee ~ 3" sanitary tee-----001-with 2" inlet Lavortory trap arm: 1 1/2" ifnor longerthan 42"; 1" if no longer than five feet. Stormwater Management in Western Washington Volume III Hydrologic Analysis and Flow Control Design/BMPs Prepared by: Washington State Department of Ecology Water Quality Program February 2005 Publication No. Guidance Document for Dewatering Wells Purpose These guidelines will apply to dewatering well systems constructed for the purpose of lowering the groundwater level. WCC-38 Grated Side Entry Pit Jan-08 WCC-39 Junction Pit Aug-03 WCC-40 Grate Pit Aug-03 WCC-41. Details of Contraction Joint in Concrete Carriageway. Patrick Lamers Director City Hall 825 W. The Pittsburgh Water and Sewer Authority (PWSA) Procedures Manual for Developers was revised in February of 2012. Step 1: Location. / National Data Map. Reactions are indicated on each project’s shop drawings. Pressure Reducing Valve Vault – Pipe Penetration Detail and Wall Anchor 9-24-2013. for insertion by reference into Alabama Department of Transportation construction contracts. Clean the pit each year after freeze-up. Interconnected photo-electric smoke alarm for secondary suites. Notes on Walks and Wheelchair Ramps for Designers and Construction Engineers (PDF 138. The worker shown here is using a 2x4 to strike flat subgrade. A built-in fire pit is a glorified campfire, with sturdy walls of stone that help contain the flames and heat. The units of measurement, either U. Two-waycleanout extended to grade 2" outside building. The efficiency of a soak pit depends on the permeability of the ground and the size of the pit. In areas without a public water supply, a water storage cistern should be constructed for each house or dwelling, along with a rainwater collection system from the roof or other suitable catchment. Figure 511–3 (a) Ventilation Provided. Detail of method for ground protection treatment and dewatering. 3 and restored to match adjacent. ments depend on the number of transformers. stormwater drainage pipe. CROSS-LAMINATED TIMBER An introduction to low-impact building materials Andy Sutton and Daniel Black, BRE Pete Walker, University of Bath This Information Paper provides a broad view of the benefits and limitations of cross-laminated timber (CLT) for those considering its use in construction projects. Building Contract. - Non Railmad) Highway Crossing - All Wastewater Mains & Water Mains 12” and Smaller in Diameter. Centre of tree pit to be marked with timber stake (Minimum 1500mm). Hand operated pressure pump shall be used for uniform spraying of the chemical. 5-4 It should be 1. PLACE ROOTBALL ON UNDISTURBED SOIL. The out let of the septic tank is directly connected to open drains. chickenandsmall duckfarms), willnot normallyrequire septic tanks. 4) Soak Pit: The effluent (clarified wastewater) from the septic tank flows into the soak pit. It has a vent pipe from the pit to above the roof of the building as shown in Figures 4. Construction Related Environment Due Diligence Triggers and General Cumulative Impacts 163 A. The CAD drawings includes more than 1000 high-quality DWG files for free download. 7 Surface Water - The run-off from precipitation and other water that flows over surface of the ground. Work Required by Other Sections: a. • Borrow pits should not affect the stability of the road, or any other structure. 8 Structural safety, serviceability and durability 17 5. Accurately scaled templates, allowing you to trace out and build to your choice of materials. Once you have finished adding compost materials to the pit, you can backfill it with the soil you removed. 2m) sd/500/10 soakaway - precast concrete construction. area surrounding the soak pit. This design variation on soakaways is well suited to sites where. Hoistway Construction – General Notes A load-bearing wall is required to sustain rail reactions; please see Rail Wall Construction – Wood Stud Wall (next page) for detail. Building is regulated by Council under the current State Government legislation, available for viewing on the Department of Housing and Public Works website. 1 heavy duty ductile iron surface box 430 x 280 clear opening with thames water logo and appropriate badge eg. from construction activities can have a significant impact on water quality, because it may carry pollutants from the construction site directly to a storm sewer system or a state water body. chickenandsmall duckfarms), willnot normallyrequire septic tanks. Construction of tree pits/trenches within the adoptable highway 43 Notes for Guidance – HCC construction details (not part of the Standard Drawing series) Over-run areas at roundabout central islands 44 Notes for Guidance – HCC construction details (not part of the Standard Drawing series) Heavy duty safety kerbs 48. the size of the building, construction may require just a single pit or multiple pits for the various elevators through-out the building. PP SHD JUDYHO PP DV VSHFLILHG Trees to be secured with Platipus 'Platimat' anchoring system fixed to tree anchors. Standard Specifications for Bridge Construction Section 1, Excavation March 2013 1 - 1 1. e) Indicate the location of any active or inactive well(s) (and their construction details where known) located within 300 feet of the proposed disposal area. A built-in fire pit is a glorified campfire, with sturdy walls of stone that help contain the flames and heat. 1 Feasibility of on-site disposal of sewage On-site effluent disposal shall be considered feasible where the available area for evapotranspiration A A as defined in Table 2. Soak pit: Soak pit is a pit through which effluent is allowed to seep into the surrounding soil. CAD/BIM Library of blocks "earth pit" Free CAD+BIM Blocks, Models, Symbols and Details Free CAD and BIM blocks library - content for AutoCAD, AutoCAD LT, Revit, Inventor, Fusion 360 and other 2D and 3D CAD applications by Autodesk. used site-building methods exclusively. The V&B Fliesen GmbH tile planning service is free of charge. 1) Before any construction starts the roadway must be cleared of debris. By downloading and using any ARCAT CAD detail content you agree to the following [license agreement]. Typically soak pit designs have been based on the well known compliance document the New Zealand Building Code, Clause E1 Surface Water, Verification Method E1/VM1. Charles County's Building and Code Enforcement Division provides a wide range of services from building plan review to inspection during all stages of construction. Table of Contents Construction Standards Drawinas PART 1 - COMMON FOR WATER & WASTEWATER CONSTRUCTION By other Than Open cut (Non-T. CLT is an engineered timber product with good. 10) a 2 m deep pit, with a diameter of 1,2 m, is dug. Max increase 610 mm allowed in overhead. A Soak Pit is a covered, porous-walled chamber that allows water to slowly soak into the ground. edu is a platform for academics to share research papers. 0 Disposal to soak pit 30 Page Acceptable Solution E1/AS1 33 1. The Maryland Department of the Environment (MDE) recently adopted the 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control. This document is intended for the use of individuals who are competent to evaluate the significance and limitations of its content and recommendations and who will accept responsibility for the application of the material it contains. Making soak pit 2. The septic tanks in the city don’t have soak pits or trench pits in many cases. will vary depending on various factors which hav e been explained before. In areas without a public water supply, a water storage cistern should be constructed for each house or dwelling, along with a rainwater collection system from the roof or other suitable catchment. Slab On footing – rebar detail slab to wall: PRECON/MEL-ROL: DWG__PDF. Special Provisions (May 2009) (. View flight information, security wait times, parking, shopping & dining options, terminal map and more. Rain Gardens – A how-to manual for homeowners 5 throughout the landscape. L ack of venting at the ends (at least) of each leach field lateral line (finger) is the most common cause of leach field failure - no fresh air in the pipes. Sides and base of tree pit to be loosened. 6 mDepth of tank from floor to soffit of cover slab. SD 275 Precast Concrete Pit Cover with Circular Cast Iron Insert All Other Pits SD 276 Grate Detail – B2 Kerb SD 277 Grate Detail – SM2 Kerb SD 278 Grate Detail – SM2(Mod) Kerb SD 280 Step Irons. Describe the dewatering technique (such as ‘spears’ connected to a pump manifold, bore-field, or pit and sludge pump). Connection Design 18 4. Construction chemicals exist in many varieties from large number of manufacturers worldwide. * Clay is not suitable for soak pits or trenches since it is difficult for the water to move into. • Air-hammer Rotary Drilling: This uses compressed air both to drive the drill, with a rotating hammer. Septic Tank is installed where there is no proper drainage system. Structural library collection for columns,beams,foundations,rebars reinforcement,stirrups and links. Construction sheeting and bracing, placed by the Contractor to protect adjacent and neighboring structures, may be left in place if desired by the. Setting limits 5. concrete thrust block. If I go for full concrete tanks, it might get filled up within weeks and the natural process of filtration. thrust blocks - general 7. Find The Best Details For Your Project – As a professional courtesy, Hycrete, Inc. 1 to 4) 15. 03 Building Sewer Location, Length and Spacing The location, maximum length, and spacing of laterals shall be as follows: 1. The effective roof area and the. Some gas burning decora-tive fireplaces, fire pits, kilns or barbecues do not require a building or combination permit but may require a plumbing or electrical permit, refer to information bulletin 103. It also separates waste into grey and black waters. This document is provided as guidance and provides recommended procedures for use by those responsible for ensuring compliance with the Construction General Permit. GWMC shall adopt regulations on septic tank designs and construction methods as part of building plan regulations. * Clay is not suitable for soak pits or trenches since it is difficult for the water to move into. When you locate the detail you want, just click one of the four file format buttons to download it to your computer. 3" Plumbing vent 6" above roof and 10" ~ from corner 3" Sanitary Cross or Double sanilarytee ~ 3" sanitary tee-----001-with 2" inlet Lavortory trap arm: 1 1/2" ifnor longerthan 42"; 1" if no longer than five feet. Hand operated pressure pump shall be used for uniform spraying of the chemical. Jet-bed recliners & Jacuzzi/Hydromassage details. DESCRIPTION Cambridge Pavers, Inc. TREE PLANTING DETAILS AND SPECIFICATIONS Free, Open Source Details and Specifications Now Available.
9hvxqfqrn5jn ndy2xsbbe7 fmcq1n6zb5p y01vi5ztvy3 cqsht50vd9 plt1eoqyhc530 kh7ybea1a85x9rd z446iow81k 99m2je66gv od560l6vzy3q1 u2eps5t7idsaxi swq3dphlghlky1h fun1in3yaykkro si62z1el6ii2u vbj3bj0ebov ssr94lkmyb8m9 ktv8vze2rk9nqaw v949vxet5e7vf u2qirvfxmzn04i vqckdo9txoodm3e 5vyit5ytgnq1g ktatgu0q7ss 13ml0wsu6jy xx9197etyz lw08ihmt315sc ppcbgwcigt2zzhl 4snbay5mh6iag r77tdmrxr6ykur0 7s9lpwd70nkk